CCRMC Cart Wash Upgrade
The project includes the removal of an existing cart washer and installing a new cart washer in the hospital’s SPD. There is also the installation of a new DI water system and air compressor in the boiler room and stairwell. Work includes but is not necessarily limited to demolition and removal of the old cart washer, modifying the existing building structure to accommodate the new cart washer, installing the new cart washer, installing the new DI water system, installing a new air compressor, and other minor modifications as shown in the drawings titled “CCRMC Cart Wash Upgrade, 2500 Alhambra Avenue, Martinez, CA 94553 – HCAI Backcheck Response 05/12/2023” and “CCRMC Cart Wash Upgrade, 2500 Alhambra Avenue, Martinez, CA 94553 – Change Order CO-01 / ACD0001 12/20/2024” by Ratcliff. The contractor shall also procure the new cart washer, DI water system, and any associated parts and pieces for both pieces of equipment. Furthermore, the contractor shall adhere to instructions provided by the hospital’s Infection Control Risk Assessment (ICRA) department.
Status
Accepting Bids
Prebid Date | 3/26/25 10:00am |
Bid Date | 4/17/25 2:00pm |
Location
Contra Costa County, CA
The estimated construction contract cost (Base bid) is $2,000,000
On March 26, there will be an in-person Job Site Visit at 2500 Alhambra Avenue,Martinez, California, 94553. Please meet at the main lobby of the hospital. **Because of the restrictive nature of the facilities, the site will only be open for inspection by bidders on Wednesday, March 26, 2025 at 10:00 a.m.