Lake Street Overlay & Recycled Waterline Between Grant Street & Silverado Trail, PJ No. 19-5536
General Description of Work: The work, in general, consists of improving Lake Street between Grant Street and Silverado Trail by reconstructing the pavement; installing an extension of the City’s recycled water line; replacing specific drainage, laterals, and sections of curb, gutter, & sidewalk; traffic striping; traffic control; water pollution control; and related items of work as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.
Status
Accepting Bids
Prebid Date | 4/8/25 10:00am |
Bid Date | 4/30/25 2:00pm |
Location
Calistoga, CA
The Engineer’s Estimate is $1,900,000.
The City will conduct a non-mandatory pre-bid meeting on April 8, 2025 at 10:00 A.M. The meeting will take place at the project site and will meet at the corner of Lake Street and Grant Street, Calistoga, CA 94515. The City encourages all prospective bidders and subcontractors to attend. Bidders who do not attend the pre-bid meeting will be responsible for their bids, and all provisions thereof, to the same extent as those bidders that did attend. Those bidders who do not attend the pre-bid meeting will not be excused from their bid or any provision thereof on account of information that was available at the pre-bid meeting.