2025 Buchanan Street Repair Project No. C25-05
Project consists of pavement repair on City arterial Buchanan Street at the section located between Pierce Street and Jackson Street and the arterial Marin Avenue between Jackson Street and San Pablo Avenue. Pavement repair generally consists approximately 2,700 square yards of 4-inch asphalt concrete pavement removal and replacement. Traffic striping within project limits will be refreshed, including traffic striping unaffected by the pavement repair. Additional pavement repair at a nearby location on Eastshore Highway between the driveway entrance to the Target shopping center and the driveway entrance to the Toyota of Berkeley Service Center is included as optional Bid Alternate A.
Plan Holders
Date | Company | Contact |
3/26/25 3:27 pm |
Always Paving
20906 Corsair Blvd. Hayward, CA 94545 |
Harold Hutson
Tel: 510-789-6610
|
3/25/25 7:57 am | Construct Connect |
Rye Jumuad
Tel: 323.602.5079
|
3/26/25 4:51 am |
Dodge Data & Analytics
2860 S State Hwy 161 Ste 160 #501 Grand Prairie, TX 75052 |
Jayalakshmi L
Other
Tel: 413-376-7032
Fax: 609-336-2767
|
4/1/25 11:20 am |
JV Lucas Paving
865 Howe Rd. Martinez, CA 94553 |
Aaron Mayer
Estimator
Tel: 9256838035
|
3/24/25 10:16 pm |
Kerex Engineering Inc.
93 Monte Cresta Ave. Pleasant Hill, CA 96523 |
Hector Barajas
Project Engineer
Tel: 9253878913
Fax: 9253870853
|
3/30/25 11:50 am |
Spektren Engineering,Inc.
7810 Monterey St Gilroy, CA 95020 |
Emiliano Villalobos
President
Tel: 6692941903
|
3/30/25 11:48 am |
Villalobos and Associates Inc.
645 RUCKER AVE GILROY, CA 95020 |
Emiliano Villalobos
Vice President
Tel: (669) 294-1903
Fax: +1 (408) 843-8178
|