2022 Traffic Signal Improvements Project, CIP No. ET8279

The work shall include In general, the work shall include mobilization, public notification, traffic control; hot-mix asphalt (HMA) patches and base repairs; concrete improvements, including curb ramp replacements for ADA compliance, sidewalk and curb and gutter repairs; bike and pedestrian path reconstruction requiring removal of asphalt concrete pavement and underlying subgrade materials; etc.

Status

Accepting Bids

Bid Date 4/15/25 2:00pm

Company & Contacts

City of Davis
Kevin Fong  

Location

Davis, CA

**Pre-Qualified Contractors Only** (see list above)

Engineer’s Estimate: $1,750,000