Del Rey SDC Portable "G" Project
The Project consists of: Temporary installment of a portable building and associated site and utility work. Scope includes the demolition and disposal of an existing ball wall, and demolition and disposal of two (2) each basketball posts.
Status
Accepting Bids
Prebid Date | 4/3/25 9:00am |
Bid Date | 4/29/25 2:00pm |
Location
Orinda Union School District
Engineer's Estimate of $268,000
Construction Start is 6/2/2025
Construction Completion is 7/31/2025
A mandatory pre-bid conference and site visit will be held on April 3, 2025, at 9:00 a.m. at Del Rey Elementary School, 25 El Camino Moraga, Orinda, California 94563.