Antioch Library, WH100A
The project includes one building with a total of 11,803 SF to demolish and replace several electrical systems. The existing main switchboard will be replaced with a 600A switchboard to accommodate the lighting changes and provide capacity for future electrical services. The interior lighting system will either be retrofit or new light fixtures with energy efficient light emitting diode (LED) bulbs will be installed. In addition, new power outlets will be installed on the main library floor for public use. Lastly, the installation of power outlets triggers accessibility improvements for the building which includes accessible parking re-location, path of travel improvements from the parking lot to the main entrance, and public restroom upgrades.
Plan Holders
Date | Company | Contact |
4/3/25 3:58 pm |
Bay Area Builders Exchange
3055 Alvarado Street San Leandro, CA 94577 |
Jeannie Kwan
Plan Room Coordinator
Tel: 510-483-8880
Fax: 510-352-1509
|
4/7/25 1:53 pm |
Construct Connect
30 Technology Pwy S 100 Norcross, GA 30092 |
Morgan Stinson
Content Specialist
Tel: 18003642059
|
4/3/25 3:58 pm |
Construction Bidboard, Inc.
11622 El Camino Real # 100 San Diego, CA |
000 Plan Room
Tel: 800-479-5314
|
4/3/25 3:58 pm |
Dodge Data and Analytics
2860 S State Highway 161 Suite 501 Grand Prairie, TX 75052 |
000 Plan Room
Tel: 413-304-2008
Fax: 306-336-2767
|
4/3/25 3:58 pm |
Marin Builders Exchange
660 Las Gallinas Avenue San Rafael, CA 94903 |
000 Plan Room
Tel: 415-462-1220
|
4/3/25 3:58 pm |
Placer County Builders Exchange
10656 Industrial Ave Suite 160 Roseville, CA 95678 |
Kellie Russell
Tel: 916-771-7229
|
4/3/25 3:58 pm |
Stockton Builder's Exchange
7500 North West Lane Stockton, CA 95210 |
Jan Luna
Tel: 209-478-1005
|