Dublin Blvd Slide Repair - Between Inspiration Drive & Silvergate Drive
Project Scope: The Project is more specifically defined in the Contract Documents, but generally includes: furnishing all labor, materials, tools, equipment, transportation, and services necessary to perform the construction of slope repair and trail repair along Dublin Blvd. The project consists of slide debris removal and slope reconstruction, grading, rock slope protection and drainage improvements, and asphalt trail reconstruction. Improvements, as shown on the plans, described in these Specifications and other Contract Documents entitled as shown above, now on file in the office of the Public Works Director, to which reference is hereby made for further particulars.
Status
Accepting Bids
Prebid Date | 4/24/25 11:00am |
Bid Date | 5/15/25 2:00pm |
Location
Dublin, CA
Cost Estimate: The City’s estimated total construction cost for this Project is $690,195. The estimate is intended to serve merely as a guideline of the magnitude of work. Neither the bidders nor the contractor shall be entitled to claims because of any inaccuracy in the estimated cost.
Pre-bid meeting: Contractors bidding the project are required to attend the mandatory pre-bid conference prior to bidding. The pre-bid conference is scheduled for April 24, 2025 at 3:00 p.m. and April 29, 2024 at 11:00 a.m. and will be located at the Dublin City Hall, 100 Civic Plaza. Bids will not be accepted from contractors that do not attend one of the pre-bid meetings. Sub-contractors are not required to attend the pre-bid conference.