Willow Pass Trim Replacement Project, PJ 2393

The work to be done in general consists of the complete trim replacement of the existing Willow Pass Recreation Center located at the Willow Pass Community Park in Concord, CA. The work will consist of: site mobilization and general conditions (including but not limited to temporary fencing, etc.), removal of the existing wood trim and downspouts, inspection of existing substrate once exposed, repair and if necessary replacement of portions of the existing substrate, underlayment, and/or waterproofing membrane to receive new wood trim and/or sheet metal flashings, installation of new wood trim, downspouts, and painting and sealing of new trim systems. This work includes all preparation, materials and accessories, clean up, demobilization, conformance to existing conditions necessary for complete and functional installed new trim systems, and all other work as specified in these Special Provisions and Technical Sections.

Status

Bidding Closed

Prebid Date7/25/24 2:30pm

Bid Date8/8/24 2:30pm

Company & Contacts

City of Concord - Engineering Services
Deyuanne Lei  

Location

Concord, CA

The estimated construction cost for the project is approximately $170,000.

Optional Pre-Bid Job Meeting: The City will host an optional pre-bid job meeting on Thursday, July 25th at 2:30 pm. At this meeting the grounds around the Willow Pass Recreation Center will be made available to any perspective bidders. This pre-bid job meeting is not a requirement.