Willow Pass Trim Replacement Project, PJ 2393
The work to be done in general consists of the complete trim replacement of the existing Willow Pass Recreation Center located at the Willow Pass Community Park in Concord, CA. The work will consist of: site mobilization and general conditions (including but not limited to temporary fencing, etc.), removal of the existing wood trim and downspouts, inspection of existing substrate once exposed, repair and if necessary replacement of portions of the existing substrate, underlayment, and/or waterproofing membrane to receive new wood trim and/or sheet metal flashings, installation of new wood trim, downspouts, and painting and sealing of new trim systems. This work includes all preparation, materials and accessories, clean up, demobilization, conformance to existing conditions necessary for complete and functional installed new trim systems, and all other work as specified in these Special Provisions and Technical Sections.
Addendum 1
(click to expand/collapse)
Name | Size | |||
2024-08-05_2393 Addendum No 1 | 202.7 KB |