Yajome Sidewalk Repair Project - (SW23PW01)
The work generally consists of sidewalk repair and construction of a new concrete driveway and reinforced concrete car port. Additionally, two mature trees are to be removed.
Specifications
(click to expand/collapse)
Name | Size | ||
Specifications_SW23PW01 | 4.8 MB |