Treat Boulevard Fiber (Phase 2) - Project No. 2656
The work to be done in general consists of mobilization, traffic control, water pollution control, demolition, potholing of existing utilities, fiber optic conduit and cable installation, and all other work as shown on the Plans and as specified in these Special Provisions.
Addendum 1
(click to expand/collapse)
Name | Size | |||
PJ 2656 Addendum No. 1 FINAL | 6.9 MB |
Addendum 2
(click to expand/collapse)
Name | Size | |||
PJ 2656 Addendum No. 2 FINAL | 3.1 MB |