Treat Boulevard Fiber (Phase 2) - Project No. 2656
The work to be done in general consists of mobilization, traffic control, water pollution control, demolition, potholing of existing utilities, fiber optic conduit and cable installation, and all other work as shown on the Plans and as specified in these Special Provisions.
Status
Bidding Closed
Bid Date | 12/14/23 2:30pm |
Company & Contacts
City of Concord - Engineering Services
Kevin Wheat
Kevin.Wheat@CityofConcord.org
Location
Concord, CA
There will be no pre-bid conference for this project; however, bidders are highly encouraged to visit the site.
The estimated construction cost for the Total Bid is $1,800,000.