Betty Reid Soskin Middle School Exterior Painting

Exterior painting of building 100, 200, 300, 400, 500, 600, 800 cafeteria building, and portable. Exterior painting of all fences, gates, door & frame, windows trim, railing, columns & downspouts All existing soffit, fascia & beam shall be sand & repair as needed, for new painting.
Addendum 1 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
2.16.24 COMBINE DRAWING ADDENDUM 64.8 MB
2.26.24 09 91 00 Painting Spec FINAL 95.3 KB
1000004378.BRSExtPaint.Addendum1.FINAL 1.8 MB
Addendum 2 (click to expand/collapse)
Name Size
1000004378.BRSExtPaint.Addendum2.FINAL 403.0 KB