Cowell Road Pavement Maintenance, Project No. 2604

The work to be done in general consists of mobilization; traffic control; water pollution control program; clearing, grubbing, trimming, and root pruning; removing and replacing concrete sidewalk, curb, and gutter; cold planning of asphalt roadway; placement of Hot Mix Asphalt (HMA) materials; crack seal and slurry seal; lowering and adjusting utility covers to finish grade; removal and replacement of traffic striping and curb paint; and all other work shown on the Plans and as specified in these Special Provisions.
Plans (click to expand/collapse)
Name Size
2604-Plans_BID 18.2 MB