GCID Hardening Electrical Improvements Project

The project generally includes: furnishing and installing Automatic Transfer Switches at both locations, connection of generators at both locations, and furnishing and installing instrumentation for a 300,000 gallon bolted steel storage tank.
Addendum 1 (click to expand/collapse)
Name Size
Addendum_01-Elec 223.1 KB
Addendum 2 (click to expand/collapse)
Name Size
240531-Addendum_02-Elec 1.2 MB