Residential Pavement Maintenance - Phase C, PJ No. 2606 + 2618

The work to be done in general but not limited to consist of mobilization; traffic control; water pollution control program; installing of new roadway pavement section; cape seal; cold plan and overlay asphalt roadway; removal and placement of Hot Mix Asphalt (HMA) materials; removal and replacement of concrete sidewalk, curb, gutter, curb ramps and driveways; reconstruction of valley gutters at intersection; lowering and adjustment of utility covers to finish grade; removal and replacement of traffic striping and pavement markings; installing of bike green striping and markings; relocating roadside signs; and all other work shown on the Plans and as specified in these Special Provisions.
Specifications (click to expand/collapse)
Name Size
PJ2606+2618 Specs 1.5 MB