2024 Annual Pavement Rehabilitation
The work to be performed generally consists of pavement rehabilitation of various streets within the City of Orinda. Such work includes, but is not limited to; mobilization, demobilization, traffic control & construction signage, installation of erosion control measures removal & replacement of concrete curb & gutter, removal & replacement of concrete valley gutter, construction of concrete curb ramps, construction of AC dikes, , base failure repair (digout), base over-excavation if required, removal of asphalt concrete and aggregate base, milling/cold planing, hot mix asphalt (HMA) overlay, microsurfacing, cape seal, adjustment of utility manhole frames and covers, adjustment of survey monuments, adjustment of valve boxes, storm drain pipe lining, installation of theromoplastic traffic stripes, placement of thermoplastic pavement markings, installation of blue reflectors, installation of crosswalks, production of as-built drawings, production of pothole data, locating & preserving survey monuments, removal & installation of traffic signs, filing of appropriate record documents with County recorder's office, and all other work as shown on the plans and as described in the Caltrans Standard Specifications and these Special Provisions to provide a complete project.
Specifications
(click to expand/collapse)
Name | Size | ||
2024 Annual Pave Rehab Proj 4178_Bid Package_07.02.2024 | 27.4 MB |