Cyclic Sewer Replacement Project, Phase 21
Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with removing and installing sanitary sewer mains, sewer laterals, maintenance holes, cleanouts, curb, gutter, sidewalk, driveway, street patch, water pollution control, traffic controls and all other associated work to complete the project at the locations designated in the plans.
Specifications
(click to expand/collapse)
Name | Size | ||
Cyclic 21_Specification_Complete for BPxpress | 64.9 MB |