Concrete Pathway Repairs, PW 394-18
Work to be Performed: The work shall generally consist of removing and replacing broom finished and exposed aggregate pathway concrete at various locations. The work shall include, but not be limited to, adjusting existing facilities to grade, relocating and reinstalling existing facilities, and water pollution control.
Addendum 1
(click to expand/collapse)
Name | Size | |||
PW 394-18 Concrete Pathway Repairs Addendum No. 1 | 7.6 MB |