Foothill Drive Curve Realignment Project
General Work Description: Reconfigure the curve on Foothill Drive approximately 1,116' from the City of Vacaville limits. Construct a 32 feet wide roadway section of 2" of 1/2" HMA over 3" of 3/4" HMA over 12" of aggregate base. The work also includes: embankment construction, retaining wall, ditch excavation, concrete v-ditch, adjusting facilities to grade, signage and striping, and potential removal of hazardous waste.
Plans
(click to expand/collapse)
Name | Size | ||
00_Foothil Drive Curve Realignment Project Plan | 34.4 MB |
Supplemental Plans
(click to expand/collapse)
Name | Size | |||
01_Foothill Drive Curve Realignment Project_X Section | 2.1 MB |