Citywide Accessibility Improvements No. 11 , PJ - 2725

The work to be done in general consists of mobilization; preparatory work, securing the work area for public safety, and site cleanup daily, clearing and grubbing, traffic control; water pollution control program; earthwork and pavement and landscape grading; cold planning of asphalt pavement; placement of Hot Mix Asphalt (HMA) overlay; storm drain trenching and shoring, removal & placement of pipe and structures, concrete curb, curb ramps, and sidewalk; pruning and removal of tree roots; lowering and adjustment of utility covers to finish grade; removal & replacement of traffic striping and pavement markings; installation of trash capture devices; installation of roadside signs; and all other work shown on the Plans and as specified in the Project Manual and all other work as specified in these Special Conditions, Technical Provisions, and as shown on the Plans.
Addendum 1 (click to expand/collapse)
Name Size
2024-11-13_2725 Addendum No 1 716.9 KB