Tara Hills Curb Ramps On Shawn Drive Project
General work description: The work to be done generally consists of installing 14 curb ramps at selected intersections along Shawn Drive in the Tara Hills residential area. Work near the intersection of Shawn Drive and Delmore Road will also include installation of one raised speed table, and two (2) rectangular rapid flashing beacons. Ancillary improvements include removal and replacement of existing concrete valley gutter and asphalt concrete, and removal and installation of thermoplastic pavement markings.