Orinda Library HVAC Rehabilitation Project No. 4174
General work description: The work to be done generally consists of HVAC control and equipment replacement to improve performance and efficiency.
Bid Documents
(click to expand/collapse)
Name | Size | ||
Notice to Bidders & Specs | 3.0 MB | ||
Proposal & sample contract | 1.0 MB |
Reference Documents
(click to expand/collapse)
Name | Size | |||
Appendix A- HVAC System Equip. Assessment Report | 2.2 MB | |||
Appendix D_ Screenshots of Existing Controls System Graphics | 626.4 KB | |||
Appendix E Boiler Equipment Cutsheet | 3.1 MB | |||
Appendix F Mini-Split Unit work description for Cafe (completed) | 90.8 KB | |||
Appendix G PVT Scan | 94.1 KB | |||
Appendix G PVT Scan.xlsx | 119.8 KB | |||
Appendix H Energy Conservation Data Analysis Report | 2.7 MB |