Residential Pavement Maintenance Phase E - PJ No's 2613 & 2621
Scope of Work: The work to be done in general consists of mobilization; preparatory work, securing the work area for public safety, and site cleanup daily, clearing and grubbing, traffic control; water pollution control program; rubberized cape seal (ARAM); digouts; cold planning of asphalt pavement; placement of Hot Mix Asphalt (HMA); concrete curb, gutter, curb ramps, and sidewalk; pruning and removal of tree roots; lowering and adjustment of utility covers to finish grade; removal & replacement of traffic striping and pavement markings; installation of fiber optic conduits and boxes; installation of roadside signs; and all other work shown on the Plans and as specified in the Project Manual and all other work as specified in these Special Conditions, Technical Provisions, and as shown on the Plans.
Addendum 1
(click to expand/collapse)

Name | Size | |||
PJ 2613-2621 Addendum No. 1 FINAL | 28.0 MB |