Concord Community Park Solar Array Repair (PJ2718)

Scope of Work. The project’s primary purpose is to reconstruct a portion of the parking lot solar array that was damaged by a vehicle. The work includes but is not limited to site mobilization, remove and repair of solar array pier foundation concrete and anchor bolts, disassembly and reassembly of solar array frame and panels, reinstallation of electrical system to reconnect solar PV including but not limited to conduit, conductor, and equipment, test and verify full and complete operation of electrical and PV system, attending meetings, providing required submittals and schedules, and coordinating with City’s Recreation Department.
Addendum 1 (click to expand/collapse)