Pavement & Curb Rehabilitation Project - Marin Ave Phase 2
Work generally includes, but is not limited to, 2-inch to 3-inch HMA milling, 4-inch cold in-place recycling, 2-inch to 3-inch HMA inlay, 12-inch full depth HMA, sidewalk, curb, gutter, and curb ramp improvements, installation of storm drain inlets and other storm drain improvements, installation of traffic striping, pavement markings, and K71 reflective bollards, improvements at existing traffic signals, and installation of Rectangular Rapid Flashing Beacons. The Project also includes a bid alternative for intersection street lighting improvements.
Specifications
(click to expand/collapse)

Name | Size | ||
C24-57 Marin Phase 2 - Contract-Specs-App | 12.0 MB |