Lavenida Culvert Repair
The work to be done generally consists of installing coffer dams and creek diversion to allow replacement of the invert of a 120 inch± diameter corrugated metal storm drain pipe culvert with reinforced concrete. Work also consists of excavating embankments to form and pour new concrete headwalls with decorative architectural treatment. Expect dewatering and pumping to be necessary. Comply with the permits, licenses, agreements, and certifications (PLACs) and the June 15 ‐ October 15 in‐creek work window. Tree removals, tree trimming, and vegetation removal are required as well.
Proposal Bid Book
(click to expand/collapse)

Name | Size | ||
D42 PC Booklet 2018-Lavenida | 526.7 KB |
Special Provisions
(click to expand/collapse)

Name | Size | ||
D43 SP Booklet -2018-Lavenida | 28.9 MB |
Supplemental Information
(click to expand/collapse)

Name | Size | ||
15 Lavenida TCE Exhibit | 514.2 KB | ||
Caltrans RSPs (April 2020) | 44.5 MB | ||
Caltrans RSSs (April 2020) | 1.5 MB | ||
Potential Staging Area Exhibit | 1.2 MB | ||
Project Base Survey PDF | 491.1 KB |